This proposal seeks to provide a file describing the electric vehicle chargeing infrastructure within a network.
ops_location_id
- Conditionally required, when stop_id is not used then a ops_location_id must be present
stop_id
- Conditionally required, when ops_location_id is not used then a stop_id must be present
max_kw
- Required, the maximum amount of power output possible from the charger in kw. This should be an integer value.
number_of_chargers
- Required, this should describe how many charging sessions can take place at this location.
start_time
- Describes the start of the time period of when the charging location is available.
- if blank, it is assumed there are no time restrictions.
end_time
- Describes the end of the time period of when the charging location is available.
- if blank, it is assumed there are no time restrictions.
This proposal seeks to provide a file describing the electric vehicle chargeing infrastructure within a network.
ops_location_id
stop_id
max_kw
number_of_chargers
start_time
end_time